About time. Although I would have preferred they build a bridge parallel to the QEII to connect to where the Northbound M25 road currently goings into the tunnel. Keeping the tunnel under the bridge as an option to relieve pressure when the bridges closes due to winds/whatever.
Can't quite get into my head how this one will work. It seems to simply be taking demand off the M25 by diverting traffic that would normally be heading into London by getting north of the river before existing the M25? Now they'll be leaving before the tunnel?
Oh they've added a map: