Another new build
Hi all, long time no post I guess!
I will be moving into a new build on Friday which is prewired for VM in Birkenhead. As far as I can see, all internal wiring is completed as are the empty duct to the property. There was previously a terrace at this location,which were wired, and the original ducts I presume will remain in the footway.
However, trying to get anything from VM in regards to getting connected is like trying to draw blood out of a stone. I have lost count how many times I have filled out forms with nobody contacting me back in return. I am also pestering the developer to do what they can in regards to this.
Does anyone have any idea how long this process may take? I have attached an image of the situation outside, lacking an omnibox.
Thanks
|